eng
All categories
Rome
Dismantling and installation of SGT Ruston, ABB, Alba Power, Alstom
Dismantling and installation of SGT Ruston, ABB, Alba Power, Alstom - photo 1
Renewed: 24 November 2020, 15:06

Dismantling and installation of SGT Ruston, ABB, Alba Power, Alstom

256,000/piece
Delivery terms: EXW Belgorod
Фиатов Геннадий
инженер консультант
,  Belgorod, RU
Flagma member since 18 April 2015

Description

Installation and start-up of power plants with gas turbine engines type SGT from such manufacturers as Ruston, ABB, Alba Power, Alstom, Siemens with a capacity from 2 MW to 75 MW ..
Dismantling of power plants.
Each SGT type gas turbine engine has different variants, each SGT engine has been owned by a different company over the years.
Such as Ruston, ABB, Alba Power, Alstom, and now Siemens.
For this reason, I ask you to indicate the exact name of your gas turbine engine and provide documents for the package and engine passport when contacting our specialists.
Works include the following activities:
- testing the engine at full power before dismantling;
- preparation of a sales contract; -
assessment of the risks required for the safe decommissioning of gas turbine equipment and power equipment;
- preparation of manuals and step-by-step instructions;
- physical dismantling and removal of all related equipment;
- Moving through the territory of the customer country and loading at the port, with subsequent export;
- Delivery to the place of demand;
- Unloading the power plant at the place of regular use and the end user;
- Installation;
- Configuring all systems and starting.
Gas turbine engine service company Ruston, ABB, Alba Power, Alstom, Siemens provides services all over the world.
Development of technical specifications
(Technical inquiry) based on repair documentation.
We provide services for troubleshooting gas turbines, conducting Inspections, overhaul, refurbishment.
Please contact our duty engineers and consultants for more detailed information.
Please contact by WhatsApp

Ad number: 1760051   |  views: 7  
,  Belgorod, RU
Flagma member since 18 April 2015

Similar ads

Installation, configuration and start-up power plants Ruston SGT-200
$650,000/service EXW
Stanok expert, LLC, RU, 149 km +30 ads
Installation, configuration and commissioning of gas turbine power plants Siemens (Ruston) SGT-200 with a capacity of 6.5 MW. The gas turbine...
Монтаж, настройка и запуск электростанций Ruston SGT-200
$650,000/service EXW
Stanok expert, LLC, RU, 149 km +30 ads
Монтаж, настройка и запуск газотурбинных электростанций Siemens ( Ruston ) SGT-200 с мощностью 6,5 МВт. Предприятие по сервису газотурбинных...
205 MW SGT800 complete combined cycle power plant
$60,000,000/pc EXW
Stanok expert, LLC, RU, 149 km +30 ads
Installed Capacity - 205 MW. Energy Generation Capacity - 1640 GWh/year. Commissioning Date - 16.06.2013. Configuration - 3 X SGT-800 GT + 1 x ST....
Show more
Contact the company
Фиатов Геннадий
инженер консультант
By phone
In messenger
Say, that you found an ad on Flagma
Safety rules: Do not agree to a prepayment if you are not sure about the reliability of the company.
Write a message
Select category
×
Login to your account